From working prototype to first production batch
The gap between one working prototype and a hundred identical units is where most hardware projects lose months. It closes faster when each step has a clear test and a clear pass.
The usual steps
- Engineering samples: does the design work as intended, built close to final parts?
- Design validation: does it survive drops, heat, cold, humidity, power cuts and real users?
- Production samples: made on real tooling, by the factory, at line speed.
- Pilot run: a small batch to check yield and the assembly and test process.
- First-article inspection, then the first full batch against a signed golden sample.
What to test before you order
- The failure you fear most, repeated until it either happens or clearly will not.
- Battery, charging and power-loss behaviour for anything with electronics.
- Packaging: drop and vibration in the real box.
How we help. We plan the steps with you, write the test plan for each, work with the factory on samples and the pilot run, and check the first batch before it ships.
Questions founders ask
How long does it take?
For a simple product with off-the-shelf electronics, a few months. Custom tooling, certification or a new mechanism add time. We give you a plan with dates after the first review.
Do I need certification?
It depends on what the product does and where you sell it, for example CE, FCC, UKCA or food-contact rules. We list what applies early so it is in the plan and the budget.
Can you work with my current factory?
Yes. We can work alongside a factory you already use, or help you find one.